• Home
  • About US
  • Contact Us
  • Privacy Policy
  • Terms of Use

Archives

  • October 2026
  • September 2026
  • August 2026
  • July 2026
  • June 2026
  • May 2026
  • April 2026
  • March 2026
  • February 2026
  • January 2026
  • December 2025
  • November 2025
  • October 2025
  • September 2025
  • August 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • March 2022
  • February 2022
  • January 2022
  • November 2019

Categories

  • Auto
  • Business
  • Climate & Earth
  • Coronavirus
  • Crypto
  • Entertainment
  • Happiness Basket
  • India
  • Learn | Unlearn | Relearn
  • Lifestyle
  • Politics
  • Research Discoveries
  • Science & Technology
  • Sports
  • Trending
  • Video
  • World
  • Home
  • About US
  • Contact Us
  • Privacy Policy
  • Terms of Use
Read Selective
  • World
  • Politics
  • India
  • Business
  • Entertainment
  • Lifestyle
  • Auto
  • Crypto
  • Coronavirus
  • Happiness Basket
  • Research Discoveries
  • Science & Technology

Nasa to launch Artemis-II mission to the Moon on April 1

  • March 13, 2026

Nasa said preparations are continuing at the Kennedy Space Centre, where engineers are completing final work on the rocket and spacecraft inside the Vehicle Assembly Building.

Nasa next-generation moon rocket, the Space Launch System (SLS) rocket with the Orion crew capsule. (File Photo: Reuters)

Nasa is set to launch its next Moon mission, Artemis II, on April 1 as the US space agency moves closer to sending astronauts back to lunar orbit for the first time since 1972. The mission will be the first crewed flight of Nasa’s Space Launch System (SLS) rocket and Orion spacecraft and will carry four astronauts on a journey around the Moon before returning to Earth.

The flight is designed as a major test of the spacecraft systems that will eventually enable astronauts to land on the lunar surface again under Nasa’s Artemis programme.

“This mission will prove Orion’s life support systems are ready to sustain crew on future missions and allow the crew to practice operations essential to the success of Artemis III and beyond,” Nasa said.

According to the space agency, preparations for the mission are currently underway at the Kennedy Space Centre, where engineers are completing final integration work on the SLS rocket and Orion spacecraft inside the Vehicle Assembly Building. Nasa said the rocket is expected to roll out to the launch pad on March 19 ahead of the targeted April launch window.

Once at the pad, teams will conduct additional testing, including another wet dress rehearsal, a full launch countdown simulation during which the rocket is fuelled with cryogenic propellants to ensure all systems operate as expected before liftoff.

TECHNICAL ISSUES DURING PREVIOUS DRILLS

The mission timeline has faced several delays after engineers detected technical problems during earlier drills. During one of the tests, teams discovered a helium flow issue in the rocket’s upper stage, which is used to pressurise the propellant tanks and maintain proper engine conditions.

After engineers failed to access the affected components easily at the launch pad, Nasa decided to roll the massive rocket back to the Vehicle Assembly Building for closer inspection and repairs. The issue was eventually traced to a faulty seal in the quick-disconnect system that connects ground helium supply lines to the rocket. Engineers repaired the system and ran validation tests to confirm the fix.

Earlier tests had also revealed a liquid hydrogen leak during a wet dress rehearsal, forcing Nasa to halt countdown operations and conduct additional troubleshooting before continuing launch preparations.

Despite the setbacks, Nasa officials stated such tests are designed to uncover problems before launch. Engineers are now working through final checks to ensure the rocket and spacecraft are ready for the historic mission.

Source : https://www.indiatoday.in/science/story/nasa-to-launch-artemis-ii-mission-to-the-moon-on-april-1-2881193-2026-03-13

Previous Article
  • Science & Technology

Microsoft backs Anthropic in amicus brief to halt US DOD’s ‘supply-chain risk’ designation

  • March 11, 2026
View Post
Next Article
  • Science & Technology

India’s GPS is dying: Isro’s NavIC satellite network is down to three satellites

  • March 16, 2026
View Post
You May Also Like
View Post
  • Science & Technology

An OpenAI Agent Stole Funds From A Crypto Wallet It Did Not Own To Finish A Task

  • October 19, 2026
View Post
  • Science & Technology

Heart Patients May Not Always Need Permanent Stent, New Study Finds

  • October 18, 2026
View Post
  • Science & Technology

Boycott OpenAI, mathematicians say after ChatGPT solves more than 700 problems on its own

  • October 11, 2026
View Post
  • Science & Technology

Deepinder Goyal’s Temple Wearable Launch Soon: Expected Price, Features And More

  • October 11, 2026
View Post
  • Science & Technology

Ozempic Can Become An Atomic Bomb At High Doses, Doctor Warns: What To Know

  • September 29, 2026
View Post
  • Science & Technology

Childhood Blood Proteins May Signal Heart, Liver Disease Risk Decades Early

  • September 22, 2026
View Post
  • Science & Technology

“Nationalise Us, Please”: Palantir CEO’s Take On AI’s Liability Problem

  • September 22, 2026
View Post
  • Science & Technology

Scientists Have Dismissed Black Holes as Dark Matter for Years, New Math Says They Were Wrong

  • September 21, 2026

Recent Posts

  • Oil, foreign flows in focus for rupee; bond traders eye rate-hike bets
  • Dollar steady, euro weakens after French protests turn violent
  • Beijing’s population expected to become super-aged by 2035
  • Macron urges calm as France counts cost of worst unrest in years
  • Indonesia faces rare MSCI exclusion that could cut it off from global capital
Categories
  • Auto (43)
  • Business (461)
  • Climate & Earth (16)
  • Coronavirus (17)
  • Crypto (26)
  • Entertainment (852)
  • Happiness Basket (7)
  • India (6,054)
  • Learn | Unlearn | Relearn (163)
  • Lifestyle (329)
  • Politics (95)
  • Research Discoveries (432)
  • Science & Technology (459)
  • Sports (1,003)
  • Trending (1,727)
  • Video (1)
  • World (9,952)
Read Selective

For Feedbacks, Advertisements or Any Other Concerns mail us at info@readselective.com

Pages
  • Home
  • About US
  • Contact Us
  • Privacy Policy
  • Terms of Use
Categories
  • Auto
  • Business
  • Climate & Earth
  • Coronavirus
  • Crypto
  • Entertainment
  • Happiness Basket
  • India
  • Learn | Unlearn | Relearn
  • Lifestyle
  • Politics
  • Research Discoveries
  • Science & Technology
  • Sports
  • Trending
  • Video
  • World
© 2024 Read Selective | Developed by SUGARA Technologies
  • Home
  • About US
  • Contact Us
  • Privacy Policy
  • Terms of Use

Input your search keywords and press Enter.

Go to mobile version